Mills and Petrie Building Facility Assessment Study Ashton, Illinois
WHA first met with the Library and Gymnasium Board to collect information and establish project goals. WHA then performed site inspections with architects, structural engineers, mechanical engineers and electrical engineers to gather information and document and study existing conditions.
A final report was prepared with detailed findings on the building’s structural condition for each area of the building and roof. The report also discussed the building’s use of space, accessibility and code compliance issues, electrical system, plumbing, HVAC, and fire protection.
A seven phase Long Range Plan was provided, using WHA’s professional recommendations for improvements based on observations and input from Building Trustees and users. The report also provided a professional opinion of probable cost for each assessment item to aid the Trustees in their future budget and financial planning.
WHA was proud to be a part of this important first step to ensure that this historic building can continue to serve the community into the future.