Phase I, II & III Services
This project consists of Phase I, II & III engineering services for the rehabilitation of a three span (56.5’: 56’: 56.5’) precast prestressed deck beam structure on closed concrete abutments and reinforced concrete piers. The superstructure was replaced with steel girders supporting a concrete deck under stage construction. The project also consisted of design of approach roadways and design of intersection with Lily Cache Road.
This project won the APWA SW Branch Project of the Year Award for 2017.