E. FRONTAGE ROAD OVER BR. OF GRANT CREEK

ProjectEFrontageRoadBridge2
  • LOCATION: Will County, Illinois
  • CLIENT: Will County Division of Transportation
  • CONSTRUCTION COST: $876,000
  • SCOPE OF WORK: Topo and Hydraulic Survey, Hydrologic and Hydraulic Calculations, Preliminary Design and Hydraulic Report, Project Development Report, Environmental and Waterway Permits, Stage Construction Traffic Control Layout, Structural & Roadway Design Plans, Specifications, and Estimates
  • PROJECT SCHEDULE: Completed – 2017
  • WHA TEAM: Brian Converse, P.E., S.E., Geoff Smith, P.E., Michael Wagner, P.E., Luke Nelson, P.E.

Phase I & II Services

Willett, Hofmann & Associates, Inc. was contracted by Will County to provide Phase I & II engineering services for the Frontage Road Bridge.  The project involved the design of a cast-in-place double barrel (11’ x 9’-6”) reinforced concrete box culvert and approach roadway work thereto to be built utilizing stage construction.