IL Route 40 Reconstruction

Project details

  • Location: Village of Milledgeville, Illinois
  • Client: Village of Milledgeville
  • Construction Cost: $600,000
  • Scope of Work: Survey, Plats, ROW, Drainage Design, Roadway Design, Intersection Design Study, Phase I Report, Phase II Design, and Construction Engineering
  • Project Schedule: Completed - 2017
  • WHA Team: Geoff Smith, P.E., Luke Nelson, P.E., Dan Blum

Phase I, II & III Services

The Transportation Department of Willett, Hofmann & Associates, Inc. was hired by the Village to design an access to their industrial park from IL Route 40. The design included plats and plans for the original industrial park interior, access from IL Route 40 and expansion of IL Route 40 to accommodate a left turn lane into the site. Water and sanitary sewer improvements were also a part of the design. WHA produced an Intersection Design Study for this new point of access. This project was funded by EDP and DCEO funds. WHA performed the construction engineering for the project.