Oregon Well #2, #3, and #4 Building Replacement
Project details
- Location: Oregon, Illinois
- Client: City of Oregon, Illinois
- Construction Cost: $1,697,000
- Scope of Work: IEPA PWSRFL Project Plan, IEPA PWSRFL Loan Application, Topo Survey, Well Building Design and Site Design, IEPA Construction Permit Acquisition, Bidding and Award, Construction Staking, Construction Observation and Project Management
- Project Schedule: Completed - 2018
- WHA Team: Matt Hansen, P.E., Dan Loos, P.E., Larry Griffiths
Phase I, II & III Services
Willett, Hofmann & Associates, Inc. was the lead engineering firm for the planning, design and construction phases for the City of Oregon’s Well #2, #3, and #4 Building Replacement Project. The project consisted of the demolition of the existing well building at their Well #2, #3 and #4 sites and the construction of a new well building at each site that included well piping, valves and meters, chemical feed equipment for the addition of chlorine, fluoride and phosphate, electrical and water system controls and a lab area for performing water quality testing.