
Phase II & III
The Transportation Department of Willett, Hofmann & Associates, Inc. was hired by the College to make parking lot and roadway improvements. These improvements included resurfacing the East Parking Lot, a portion of Alan Pfeifer Drive, the south portion of Sauk Road, and the connection road between the West and East Parking Lots. Several areas required patching and an effort was made to grind and resurface several areas to restore positive drainage. This project also included upgrading several sidewalk ramps to bring them to current ADA compliance standards.