Phase I, II & III Services
This project involved removing the existing single span (1@ 51’-2”) reinforced concrete T-beam bridge on closed concrete abutments and replacing it with a single span (1@ 51’-6”) reinforced concrete slab bridge on closed concrete abutments set in rock. The approach roadway work consisted of removing 250’ of pavement and reconstructing it with bituminous and approach sidewalks. This project received the 2016 APWA SW Branch Award.